Asphalt mixing plant installation conditions: The site of the asphalt mixing plant is selected to be farther away from the residents' living area, and it is convenient to receive power. The transportation is convenient, and it is close to the stone factory, which can save the material freight. According to the dismantling requirements of the mixing station, contact cranes, pallet trucks, cranes are mainly 16 tons and 25 tons. The pallet is selected according to the asphalt tank, dust box, and larger volume, depending on the model of your mixing station. Decide the size of the crane and pallet. The site of the asphalt mixing plant should be wide. It is better to keep a certain slope when building the station. It is better to know the design and production capacity to better consider.
The concrete mixing station mainly mixes and mixes the cement gravel aggregate and water through high-speed operation to make concrete mixture. It is forbidden to use a sledgehammer to remove the concrete accumulated in the concrete mixer barrel, only with a chisel. In the severe cold season, after the work is completed, the mixer drum should be cleaned with water and the water accumulated in the pump, water tank, and water pipe should be drained to prevent the pump, water tank, water pipe, etc. from freezing. Before starting the cement concrete mixer, check whether the controllers are in good condition. After shutdown, pour water and stones into the mixing drum for 10 to 15 minutes for cleaning, and then remove the water and stones. If the operator must enter the mixing drum for cleaning, in addition to cutting off the power and removing the fuse, and must lock the switch box.Asphalt Mixing Plant